Planning a new dental office in Miami, moving an existing practice, or rebuilding the network in the space you already lease? Describe it in the form below. It goes directly to ClearMax Labs, and you get an answer by phone or email. Nothing is booked online; each project starts from the details you send, and the quote is put together from those details.
Last updated: November 2026
Tell us what you are building
Practice and project details only. The plan never needs anything about a patient.
Calls to this number may be recorded or answered by an automated assistant. Please do not share patient information by phone.
Which details help most in a first message?
- The floor plan, even a photo of a sketch, with operatories, the imaging room, sterilization, the front desk and any lab marked.
- The dental equipment dealer's name and, if it exists yet, the equipment list for each room.
- The general contractor's dates: demolition, rough-in, inspection, finish and the day the schedule opens.
- If this is a first office, a second location that shares records with the first, or a move from another building.
- The doors you want controlled and the areas you want covered by cameras, or a request for a recommendation.
- Any server or computers coming from an existing office, their rough age, and the software running on them.
- The building's name and floor, which matters for the closet location in hurricane season.
Use that as a menu, not a checklist you must finish before writing. Nobody has every answer at the start of a buildout, and the plan is built to fill gaps as the project moves. A couple of sentences are enough to begin, and the reply asks for anything still missing. If the opening date is close, put it first, and name the person who signs off so the conversation reaches them quickly and nothing waits on a forwarded email.
Opening a new office soon?
Send the general contractor's schedule first. Cable and door wiring go in while the walls are open, and that window closes at inspection. The earlier the IT dates sit on the contractor's calendar, the less likely it is that drywall or a ceiling grid goes in ahead of the cable.
Mention the building's floor and, if you know it, its surge zone. Miami-Dade defines a Storm Surge Planning Zone as an area a surge of 1 1/2 feet or higher could reach during a hurricane, and that answer decides how high the closet equipment sits and whether a different room should hold it.
Moving an existing practice?
A move has two clocks: the building schedule and the patient schedule. Everything that follows the practice, from sensors to the server, comes out of the old office on a planned day and works in the new one before patients arrive. The plan lists each device that moves, what replaces the ones that do not, and the order they come back up.
There is also a records step that is easy to forget. Florida Statute 456.057(12) requires a records owner who is relocating and no longer available to patients to advertise in the local newspaper or notify patients in writing and offer them a copy of their record. The move schedule leaves time for that notice, and the records stay reachable from the first day at the new address.
Already open and only rebuilding the network?
That works too. Send photos of the closet and the ceiling above the front desk, a list of what fails and when, and the age of the server and switch. Recabling an open practice happens room by room, usually in the evenings or on weekends, so the operatories stay available for patients during the day. Old cable is tested before anyone decides to keep it, and unlabeled runs left behind by earlier tenants are traced or retired first. The quote is built from what you can describe and photograph, and if the ceiling reveals more, you hear about it before anything changes.
Equipment that arrives from the dealer late, or a contractor date that slips, is common, so tell us early when either happens; the plan moves with it rather than the work squeezing into the last week. Second locations follow the same path. Say whether the new office will share the original practice's database or keep its own, because that one answer decides whether the new site needs a server, what the connection between the offices has to carry, and how staff who split their week sign in.
Is Dentrix down right now?
This form is for planned projects, and replies are scheduled rather than immediate. If the program has stopped working and you are not a ClearMax client, call Henry Schein One's support desk first; they can tell quickly whether the problem sits inside the software. If that call ends with advice to replace the server or the network, send those notes here and it becomes a planned project.
What happens once you submit?
- An answer by phone or email, with any questions the quote depends on.
- A written scope and quote built from what you sent. Nothing is scheduled until you accept it.
- If the work turns out larger than those details showed, you are told first and the bid is revised.
Where form submissions are kept is set out on the privacy page. The kinds of buildout work ClearMax Labs takes on are on the about page.
