ClearMax Labs runs dentalitteam.com and builds the technology inside new and relocating dental offices across Miami. ClearMax technicians come on site for the cabling, WiFi, door access, cameras, displays, server and computers, delivered as one written project with a scope and an end. No monthly plan is required.
Last updated: November 2026
What does a ClearMax buildout put in the building?
- Cabling: a labeled run for each device, from the operatories, imaging room and front desk to one patch panel.
- WiFi: ceiling access points on separate staff and patient networks.
- Doors and cameras: controlled entry on the doors that need it, and cameras on entrances and hallways with the audio switched off.
- Displays: planned with the rest of the buildout.
- The server and the desks: a server set up for the practice software, a migration when an existing office moves, and a computer configured for each role.
Which trades share the job, and where are the lines?
More parties meet inside a dental fit-out than inside almost any other kind of office, so the scope draws the boundaries on day one.
- General contractor: framing, ceilings, power to the panel and the overall calendar.
- Equipment dealer: chairs, sensors, imaging and the manufacturer site plans that tell the cabling where to land.
- Internet provider: the circuit into the building, ordered by the practice as soon as the lease is signed.
- Software company: the practice program and its help desk. ClearMax Labs has no affiliation with Henry Schein One or any other dental software maker.
- ClearMax technicians: every cable, controlled door, camera, access point, the server and the workstations, installed in the building.
- The practice: the choices, the approvals, and ownership of every license and login.
From the first message to the keys
- A note through the project form describing the office and the dates.
- Follow-up questions for anything not yet known, usually the dealer's equipment list, the contractor's calendar and what is coming from an old office.
- A written scope with its quote, drawn from those answers. No date is held until the practice accepts. Should the job grow, the practice is told first and the bid is revised.
- Installation in step with construction: wiring while walls are open, devices and computers once rooms are finished.
- Testing of each run, door, camera and access point, one restore of the server backup, then the records change hands.
Why is the work planned around storms?
Because this is Miami. A server closet on the wrong floor, or a backup that only exists in the building, turns one storm into a lost week of patient history. Each plan names the building's surge zone, puts the closet equipment off the floor where it needs to be, and stores a backup copy outside the region. Miami-Dade notes that its surge planning zones deal strictly with storm surge and not with flood zones, so a building's flood zone is checked separately, and both go in the plan.
Why the records matter years later
Whoever opens the closet next, ClearMax or a different firm, should not have to guess. The record set names each cable, door, camera and access point, the network names, the server configuration and where every backup goes, and the practice keeps it. A future operatory, a new sensor or a change of IT provider then starts from a drawing instead of a day spent tracing wires.
Records law adds a reason. Florida's Board of Dentistry rule 64B5-17.002 keeps dental records for at least four (4) years after a patient was last examined or treated, so the record of where old data went matters as much as the new server. When a practice moves, Florida Statute 456.057(12) requires a records owner who is relocating and no longer available to patients to advertise in the local newspaper or notify patients in writing and offer them a copy of their record, and the move schedule leaves room for that notice while keeping records reachable from the first day at the new address.
None of this is legal advice. What those rules require of a particular practice is a question for its own counsel.
The handover file, item by item
- A drop map tying every label to a room and a device, with test results for each run.
- A list of access points, network names and the results of the patient-network isolation test.
- A camera map with each view, and a written note that audio is off.
- A door list showing how each controlled door is opened from inside.
- The server build, the backup destinations and the date of the last test restore.
- Every admin account, in the practice's own name, handed to the person the practice names.
Working hours and locations
On site across Miami. Planning happens over the floor plan and the equipment list, and the installation happens in the building, scheduled around the general contractor and the patient calendar. Inspections are booked around rough-in rather than after it, and any work in an open practice is done after hours so the operatories stay available. The permit and inspection steps for the address are named in the plan before work starts, because each building and jurisdiction in the county has its own, and a missed inspection costs more time than any other step.
